The following procedure should be followed during the installation of acid-resistant bricks:

 

Soak the acid-resistant bricks in water before laying them. Then dry them to achieve a dry-wet effect on the outside, with no water on the surface, and use color selection.

Before installing the acid-resistant bricks, pull out crosshairs along the horizontal and vertical directions. When pasting them, ensure they are horizontally and vertically aligned.

 

Note whether the acid-resistant bricks are needed for parquet flooring or whether they need to be laid in a uniform direction. Tile cutting must be accurate, the intersection of the door cover and the bottom of the cabinet must be precise, and the gaps should be uniform.

 

Keep the shop clean when laying floor tiles (clean with cotton yarn or sawdust), clean the cement mortar in the tile joints, and then complete the joints and seams.

 

When laying floor tiles, they should not be stepped on. After laying, they should be cleaned within 24 hours. Allow the joints to cut and cure.

 

After the floor tiles are laid and acceptance is completed, all cardboard should be covered and protected. Nails on the cardboard should be removed. To prevent intrusion, the cardboard and cardboard must be tightly sealed with sealant.

 

Do not use water in the absence of drainage or water supply. Do not soak the cardboard used to protect the floor tiles to prevent indirect contamination of the tiles.

 

Joints should be made before final finishing. Clean the joints first, and adjust the putty with white cement and talcum powder, ensuring the joint putty is 1mm lower than the tile surface.